The Connecticut Department of Public Utility Control (DPUC) has completed its review of CL&P's plan to install advanced meters. On December 19, 2007, the DPUC issued a Final Decision on the plan.
CL&P had proposed to invest over $275 million in an advanced metering system. The DPUC rejected CL&P's proposal and instead ordered CL&P to study advanced meters and to conduct a rate pilot to determine customer acceptance of innovative rates, such as time-of-use and other real-time pricing schemes.
The Connecticut Department of Public Utility Control (DPUC) has completed its review of CL&P's plan to install advanced meters. On December 19, 2007, the DPUC issued a Final Decision on the plan.
CL&P had proposed to invest over $275 million in an advanced metering system. The DPUC rejected CL&P's proposal and instead ordered CL&P to study advanced meters and to conduct a rate pilot to determine customer acceptance of innovative rates, such as time-of-use and other real-time pricing schemes.
In a filing dated March 17, 2008, CL&P submitted a proposal to conduct the meter study and rate pilot.
The DPUC conducted a Technical Meeting to review the proposed study. Based on its review at the Technical Meeting the DPUC directed CL&P to submit a revised proposal. In a filing dated April 15, 2008, CL&P submitted its revised proposal.
In a letter dated May 2, 2008, the DPUC issued its approval for CL&P to move forward with the meter study and rate pilot. The approval required CL&P to slightly modify its revised proposal. Follow the links below for information on this subject.
DPUC Final Decision in Docket No. 05-10-03RE01
Complete record in Docket No. 05-10-03RE01
2009-2010
During 2009 CL&P conducted a study, called Plan-it Wise, to determine whether customers would change their electric usage in response to different electric rate designs, like time-of-day rates. Use the link below to access information about CL&P's Plan-it Wise study.
In early 2010 CL&P submitted the results of the Plan-it Wise study and its proposal to install advanced meters. CL&P's proposal is being reviewed by the DPUC in Docket No. 05-10-03RE04.
Complete record in Docket No. 05-10-03RE04
DPUC Final Decision in Docket No. 05-10-03RE01
Complete record in Docket No. 05-10-03RE01
2009-2010
During 2009 CL&P conducted a study, called Plan-it Wise, to determine whether customers would change their electric usage in response to different electric rate designs, like time-of-day rates. Use the link below to access information about CL&P's Plan-it Wise study.
In early 2010 CL&P submitted the results of the Plan-it Wise study and its proposal to install advanced meters. CL&P's proposal is being reviewed by the DPUC in Docket No. 05-10-03RE04.
Complete record in Docket No. 05-10-03RE04
For information about CL&P's Advanced Meter Study and Rate Pilot contact Jessica Brahaney at 860-665-5745 or brahajm@nu.com.